1920-01-05 – Fort Collins Courier – Idlewild Road Moved ⧉
BIG THOMPSON ROAD CHANGES
Contractor Swanson, who is at work on the Big Thompson Canon road, is authority for the statement that the road at Idlewild will be changed to the north side of the river in order to eliminate the two bridges which are now maintained. The road above the Forks is frozen so hard that work will have to be abandoned there until spring. The Large rocks which have hung over several turns in the road have been blasted out and the road is made wide enough to permit two cars to pass each other in safety. ⧉
Date: 1920-01-05
Location: Idlewild, Loveland, Colorado, USA
Permalink:
https://idlewildlodge.github.io/article/1920-01-05-fort-collins-courier-idlewild-road-moved/
⧉
Source
"BIG THOMPSON ROAD CHANGES". Fort Collins Courier [Fort Collins, Colorado, USA], 5 Jan. 1920, p. 2.
Colorado Historic Newspapers Collection.
Colorado State Library,
https://www.coloradohistoricnewspapers.org/.
MLA Format
Dauth Family Archive. "1920-01-05 – Fort Collins Courier – Idlewild Road Moved." Dauth Family Archive, 27 Jun. 2022, https://idlewildlodge.github.io/article/1920-01-05-fort-collins-courier-idlewild-road-moved/. Accessed 4 Jul. 2023.
⧉
APA Format
Dauth Family Archive. (2022, June 27) 1920-01-05 – Fort Collins Courier – Idlewild Road Moved. Retrieved July 4, 2023, from https://idlewildlodge.github.io/article/1920-01-05-fort-collins-courier-idlewild-road-moved/.
⧉
Chicago Format
Dauth Family Archive. "1920-01-05 – Fort Collins Courier – Idlewild Road Moved." Dauth Family Archive. June 27, 2022. Accessed July 4, 2023. https://idlewildlodge.github.io/article/1920-01-05-fort-collins-courier-idlewild-road-moved/.
⧉